S45E4
Lexington: Engineered For Accessibility
S45E4
Lexington: Engineered For Accessibility
- Air date:2023-10-19
- User score:0.0
A lally column stands in the way of the new open floor plan. As a solution, it is removed, and the ridge beam is replaced with a trio of engineered beams. The new landscape is previewed in 3D, and tips are shared for creating an accessible bathroom.
Top Cast
Reviews
0 reviews