S28E14
East Boston | Floors in Eastie and at the BSO
S28E14
East Boston | Floors in Eastie and at the BSO
- Air date:2007-01-04
- User score:0.0
While homeowner Liz Bagley works to strip paint off the front door trim, general contractor Tom Silva creates a wood inlay to patch her kitchen floor with material salvaged from other parts of the house. Plumbing and heating expert Richard Trethewey shows host Kevin O'Connor the progress in the basement, and the anatomy of the new boiler for the first floor unit. Kevin visits Boston Symphony Hall to see how they are using custom milled maple and steel cut nails to replace the 100-year-old original stage floor, without altering the renowned acoustics of the hall. In the second-floor bathroom, Tom shows Kevin how he's milling up custom PVC mouldings to trim out a window that is in a shower well, and therefore vulnerable to water damage.
Top Cast

Kevin O'Connor
Self - Host

Richard Trethewey
Self - Plumbing and Heating Expert

Norm Abram
Self - Master Carpenter

Tom Silva
Self - General Contractor

Roger Cook
Self - Landscape Contractor
Reviews
0 reviews