Movie Empire
Lists
The Watertown House - 13

S20E13

The Watertown House - 13

The Watertown House - 13

S20E13

The Watertown House - 13

  • Air date:1998-12-19
  • User score:
    0.0
Exterior painting by Steve Kiernan and crew is underway out back, as is the erection of a white cedar combination fence and trellis along the driveway. In the kitchen, Fred Morgan explains to us the ancient process of terrazzo flooring, with a modern twist: instead of concrete, epoxy is used. Drywaller Mike Couillard shows us a tiler backing board, that unlike cementitous board, can be worked with regular drywall tools, as well as 56"" wide drywall sheets that eliminate a seam when used in high-ceiled rooms such as ours. In the basement, Bill Clayton takes us through the perimeter drain and sump system his company has installed to deal with the flooding the house suffers during heavy rains. Roger Cook and crew unload trees and shrubs from a local nursery and begin sitting them around the yard. Finally, our host gets a lesson in granite work as Lenny Belliveau completes the foundation's stone veneer.

Top Cast

Richard Trethewey

Richard Trethewey

Self - Plumbing and Heating Expert

Norm Abram

Norm Abram

Self - Master Carpenter

Tom Silva

Tom Silva

Self - General Contractor

Steve Thomas Rooney

Steve Thomas Rooney

Host

Roger Cook

Roger Cook

Self - Landscape Contractor

Reviews

0 reviews